Description

The new fair access road connects the trade fair from the north. The connection has an overall length of about 1.5 km and includes two roundabouts and a green bridge in the forest area. In the course of the project, about 500 metres of new footpaths and cycle paths were built. The surface drainage takes place via parallel troughs and ditches and is fed to the Allmannsweiler stream via a rain clarifier.

Our service

Traffic planning
General drainage planning