Description

After the detection of considerable deficiencies in the supporting structure during the last structural inspection, the Elta bridge near the Tuttlingen open-air swimming pool was renovated. The complete wooden construction was replaced and the steel construction was retained. In order to protect the supporting structure from the weather in the long term, it was provided with constructive wood protection by completely shuttering it.

Our service

Structural design
Object planning